Factory Service Manual For JLG Grove Toucan Mast Boom Lift. Manual Contains Illustrations, Instructions, Diagrams For Step By Step Remove And Install, Assembly And Disassembly, Service, Inspection, Repair, Troubleshooting, Tune-Ups.
Format: PDF
Language: English
Pages: 79
Number: MA 0237-01 (june 2000)
Bookmarks: Yes
Searchable: Yes
Model
JLG Grove Mast Boom Lift
Toucan 1010
Australian Model
Contents
-INTRODUCTION
Foreword
Important Information
-WORK PLATFORM CHARACTERISTICS
Description
Characteristics – Dimensions – Performances
-PRESSURE SETTINGS
Relief Valve Setting
Brake Release Circuit Pressure Check
Circuit Relief Valve Adjustment
Main Pressure (PR1)
Right Swing (PR2)
Left Swing (PR3)
Mast Elevation (PR4)
Jib Elevation (PR5)
Jib Lowering (PR6)
Brake Release Maximum Pressure (PR7)
Drive At Low Speed (PR8)
Counterbalance Valve Setting
-BATTERY – CHARGER
Battery
Charger
Fulmen Charger
Oldham-Hawker Charger
Westinghouse-SGTE Charger
Battery Filling
Electrolyte Specific Gravity And Battery Voltage
Centralised Filling System Maintenance
Cleaning – Battery Maintenance
Storage Of A Battery At Temperature Below 0°C (320F)
Use Of A Battery In A Cold Chamber Or In A Cold Climate
Battery Not Working Continuously Or Inactive Battery
Battery Troubleshooting
-MAINTENANCE
System Malfunctions
Cleanliness
Removal And Installation
Disassembly And Assembly
Parts Replacement
Wires And Cables
Gaskets
Care And Installation Of Teflon-Coated Bushings
Bushings
Pin
Bushings And Pin
Bushing Installation
Mast Roller Removal
Upper Rollers
Lower Rollers
Rollers
Hydraulic System
Fatigue Of Welded Structures
Loctite
Fasteners And Torque Values
Steering Switches
Main Hydraulic Power Unit
Steering Bracket Thrust Washers
Mast Section Alignment
Lifting Chains Adjustment
Chain Control And Lubrication
Control Of Chain Wear
Chain Lubrication
Overload Detection Setting
Tilt Alarm
Battery Discharge Indicator Setting
Motor Speed Controller
Fuses
Power Circuit Main Fuse
Steering Power Circuit Fuse
Control Circuit Main Fuse
Battery Voltage Indicator Fuse
Battery Filling Unit Fuse
Electronically Piloted Circuits Fuses
Drive Function Sequences – Electronic Board Potentiometers Setting
-PREVENTIVE AND MAINTENANCE INSPECTION
General
Preventive Maintenance And Inspection Required
Daily Preventive Maintenance And Inspection
Weekly Preventive Maintenance And Inspection
Monthly Preventive Maintenance And Inspection
Every 125 Hours Of Operation Preventive Maintenance And Inspection
Every 250 Hours Of Operation Preventive Maintenance And Inspection
Every 500 Hours Of Operation Preventive Maintenance And Inspection
-LUBRICATION
Lubrication Points
TESTS
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet