Factory Operating Maintenance Instructions For Bomag Paver. Manual For Owners And Operators. It Contains Important Information And Instructions For Maintenance Description Of The Functions And Capabilities Of The System. Description Of Possible Faults / Problems And Their Solution.
Format: PDF
Language: ENG
Pages: 220
Number: 00820031 (february 2016)
Bookmarks: Yes
Searchable: Yes
Model
Bomag Paver
BF700C-2
S/N 821 892 06 1001>
Contents
-INTRODUCTION
Foreword
Machine Type Plate And Engine Type Plate
-TECHNICAL DATA
Noise And Vibration Data
-CONCERNING YOUR SAFETY
General Prerequisites
Definition Of Responsible Persons
Basic Safety Regulations For Safe Operation
Handling Fuels And Lubricants
Loading/Transporting The Machine
Taking The Machine Into Service
Driving The Machine, Working Operation
Refueling
Topping Up Adblue/DEF
What To Do In Events Of Emergency
Maintenance Work
Repair
Stickers And Decals
-DISPLAY AND CONTROL ELEMENTS
Operator’s Stand
Outside Of Machine
Outside Control Panels
Screed Operating Console
Operating Console For Screed Heating
-TESTS BEFORE TAKING INTO OPERATION
Notes On Safety
Visual Inspections And Function Tests
Checking The Engine Oil Level
Checking The Fuel Level, Topping Up Fuel
Checking The Adblue/DEF Level, Topping Up
Checking The Hydraulic Oil Level
Checking The Coolant Level
Checking The Emulsion Level, Topping Up
Lubricating The Machine
Check The Grease Supply In The Central Lubrication SystemSetting-Up The Work Place
-OPERATION
Start The Engine
Driving The Machine In Transport Mode
Braking The Machine
Preparing For Work
Operation
Park The Machine In Secured Condition.
Adjusting The Auger Height
Operating The Screed
Operating The Screed Heating
Operating The Protection Roof
Emergency Procedures
-LOADING / TRANSPORTING THE MACHINE
Prepare For Transport
Loading The Machine
Lashing The Machine To The Transport Vehicle
Loading By Crane
-MAINTENANCE
Preliminary Remarks And Safety Notes
Overview Of Maintenance Flaps And Doors
Fuels And Lubricants
List Of Fuels And Lubricants
Running-In Instructions
Maintenance Table
Every 50 Operating Hours
Every 250 Operating Hours
Every 500 Operating Hours
Every 1000 Operating Hours
Every 2000 Operating Hours
As Required
-TROUBLESHOOTING
Preliminary Remarks
Starting The Engine With Jump Leads
Screed Heating Fault Code Display
Fuse Assignment
Fault Code Display In The LC-Display Unit
Engine Faults
-WASTE DISPOSAL
Final Shut-Down Of Machine
LIST OF SPECIAL TOOLS
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet