Factory Field Assembly Manual For Komatsu Super Dozer.
Format: PDF
Language: English
Pages: 155
Number: SEAW002302
Bookmarks: Yes
Searchable: Yes
Model
Komatsu Super Dozer
D475A-3
SN 10601 And Up
Contents
SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
LAYOUT OF KIT
STYLE FOR TRANSPORTATION
TOOLS LIST FOR FIELD ASSEMBLY
TIGHTENING TORQUE
COATING MATERIALS
-ASSEMBLY PROCEDURE
Installation Of Undercarriage
Installation Of Ripper
Installation Of Tracks
Adding Oil To Pivot Chamber
Installation Of Ripper Shank
Installation Of Blade Lift Cylinder
Installation Of Tilt Hoses And Trunnion
Assembly Of Blade
Adjustment Of Arm Joint (U-Blade)
Installation Of Blade
Installation Of Counterweight
Installation Of Operator’s Cab
Installation Of ROPS
Adjustment Of Potentiometer Rod
Procedure For Adjusting Blade Tilt Limit Angle
Method Of Checking Auto-Reset System (Superdozer)
Check Track Tension
Check Of Oil/Coolant Level In Each Part
Greasing Of Greasing Point
Installation Of ORBCOMM Antenna And Wiring Harness
Replacement Of Return Filter (Replacement Of Standard Filter With Flushing Filter)
Installing Direction Of Exhaust Pipe
Bleeding Air From Hydraulic Cylinders
-CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
Testing And Adjusting Operator’s Cab
Error Code
Flushing Hydraulic Circuit
-INSTALLATION OF SPILL GUARD
Introduction
Additional Parts
Manufacture Drawing For Spill Guard
Installation Procedure
FIELD ASSEMBLY INSPECTION REPORT [FOR U OR SEMI U TILT DOZER]
FIELD ASSEMBLY INSPECTION REPORT [FOR SUPER DOZER]
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet