Factory Supplement And Operators Manual For Grove Shuttlelift Crane. Manual For Owners And Operators. It Contains Important Information And Instructions For Maintenance Description Of The Functions And Capabilities Of The System. Description Of Possible Faults / Problems And Their Solution.
Format: PDF
Language: English
Pages: 150
Number: CTRL463-02 (january 2017)
Bookmarks: Yes
Searchable: Yes
Model
Grove Shuttlelift Crane
CD3330F
CD3330FL
Shuttlelift
YB4409
YB4409XL
Grove
Contents
-WARM-UP PROCEDURES—SUPPLEMENT
Cold Climate Engine Operation
Crane Warm-up Procedures
-INTRODUCTION
General
Directional Reference
Serial Number Plate
Crane Serial Number
Reports
Disclaimer
Customer Support
Specifications
Nomenclature
-SAFETY INFORMATION
Safety Messages
General
Accidents
Operator Information
Operator Qualifications
Operational Aids
Crane Stability/Structural Strength
Wind Forces
Pile Driving and Extracting
Electrocution Hazard
Personnel Handling
Environmental Protection
Maintenance
Hoist Rope
Transporting the Crane
Travel Operation
Work Practices
Jib
Parking and Securing
Shut-Down
Cold Weather Operation
Temperature Effects on Hook Blocks
Temperature Effects on Hydraulic Cylinders
Overload Inspection
-OPERATING CONTROLS AND PROCEDURES
Controls, Switches, and Gauges
Operator’s Cab
Machine Operation
Operating Practices
-CAPACITY CHART
Using the Capacity Chart
Determining Operating Radius
Determining Lift Capacity
Considerations
Determining Lifting Capacity at the Boom Extension
Pick and Carry Ranges
-ATTACHMENTS
Hoist Block
Fourth Boom Section
Boom Extension
Searcher Hook Assembly
Down Haul Weight
Installing Cable On The Hoist
Wire Rope Wedge Socket
-MAINTENANCE
Introduction
Lubricants
Maintenance Records
Special Maintenance
Preventive Maintenance
Scheduled Maintenance: Daily (Walk-Around) Inspection
Scheduled Maintenance: 50 Hours of Operation (Weekly)
Scheduled Maintenance: 100 Hours of Operation (Every Two Weeks)
Scheduled Maintenance: 250 Hours of Operation (Monthly)
Environmental Protection
Scheduled Maintenance: 500 Hours of Operation (Every Three Months)
Scheduled Maintenance: 1000 Hours of Operation (Every Six Months)
Scheduled Maintenance: 2000 Hours of Operation (Yearly)
Miscellaneous Maintenance
-ADJUSTMENTS
All Adjustments Must Be Performed By A Qualified Mechanic
-SPECIFICATIONS
Lubricants and Capacities
Engine Oil Specifications
Diesel Fuel
General Specifications
Dimensions 3330F & 4409
Dimensions 3330FL & 4409XL
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet