Factory Field Assembly Instruction For Komatsu Pipelayer.
Format: PDF
Language: English
Pages: 70
Number: GEN00024-01
Bookmarks: Yes
Searchable: Yes
Model
Komatsu Pipelayer
D355C-3
SN 14543 And Up
Contents
SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
POSITION FOR TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLY
TIGHTENING TORQUE
COATING MATERIALS LIST
-ASSEMBLY PROCEDURE
Installation Of Exhaust Pipe
Installation Of Lamps
Installation Of Gate-Type Frame
Installation Of Counterweight
Installation Of Cab
Installation Of Air Conditioner (If Equipped)
Installation Of Boom
Charging Air Conditioner With Refrigerant (If Equipped)
Check Of Oil/Coolant Level In Each Part
Greasing
-CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
Inspection And Adjustment Of Operator ‘ S Cab
Inspection Of Safety Devices
FIELD ASSEMBLY INSPECTION REPORT
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet