Factory Field Assembly Instructions For Komatsu Hydraulic Excavator.
Format: PDF
Language: English
Pages: 192
Number: GEN00015-03
Bookmarks: Yes
Model
Komatsu Hydraulic Excavator
PC1250-7
SN 20001 And Up
PC1250LC-7
SN 20001 And Up
PC1250SP-7
SN 20001 And Up
Contents
SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
KIT LAYOUT DIAGRAM
TRANSPORTATION
LIST OF ASSEMBLING TOOLS TO BE BROUGHT IN FIELD
TIGHTENING TORQUE
COATING MATERIALS
LIST OF PARTS SENT INDIVIDUALLY
-ASSEMBLY OF CHASSIS
Installation of Track Frame
Supplying Grease to Swing Circle
Assembly of Upper Structure and Undercarriage
Installation of Travel Piping
Installation of Travel Piping Cover
Installation of Swivel Travel Piping
Sticking Sheets (Counterweight)
Installation of Counterweight
Installation of Steps
Installation of Left Side Step (With Handrail)
Installation of Right Side Step
Installation of Handrail
Installation of Radiator Cover
Installation of Intake Air Cap and Muffler Tail Pipe
Installation of Left Rear-view Mirror
Installation of Right Rear-view Mirror
Preparation for Bleeding Air from Travel Motor
Procedure For Bleeding Air From Hydraulic Circuit
Tightening Swing Circle Mounting Bolts Permanently
Testing And Adjusting Track Link
Inspection Of Oil Amount And Water Amount
Parts To Be Touched Up After Field Assembly
-ASSEMBLING OF WORK EQUIPMENT OF BACKHOE
Boom Foot Pin, Boom Cylinder Foot Pin
Installation Of Boom Cylinder Foot
Installation Of Boom Cylinder Hoses
Installation Of Boom Assembly
Installation Of Boom Cylinder
Installation Of Boom Hoses (Between Chassis And Boom)
Installation Of Arm Cylinder
Installation Of Arm Cylinder Hoses
Installation Of Arm Assembly
Installation Of Bucket Cylinder Hoses (Between Boom And Bucket Cylinder)
Installation Of Bucket Assembly
Clearance Standards For Work Equipment Mount
Installation Of Work Equipment Grease Piping
Procedure For Bleeding Air From Travel Motor
Bleeding Air From Swing Motor
Bleeding Air From Cylinder
Installation Of Work Equipment Electric Wiring
Installation Of Floor Mat
Greasing Assembled Work Equipment
-PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
Reassembly of Return Filter (Standard Part o Flushing Part)
Releasing Pressure from Hydraulic Circuit
Installation of Work Equipment Flushing Tube
Flushing Hydraulic Circuit
Reassembly of Pilot Filter (Flushing Part o Standard Part)
-PROCEDURE FOR ASSEMBLING WORK EQUIPMENT OF LOADING SHOVEL
Transportation Posture (Only Work Equipment)
List Of Parts Sent Individually
Installation Of Arm Cylinder Bottoms
Connection Of Boom And Arm
Pulling Out Boom Foot Pin And Boom Cylinder Foot Pin
Installation Of Boom And Arm Assembly
Replacement Of Return Filter (Standard Element O Flushing Element)
Releasing Residual Pressure In Hydraulic Circuit
Installation Of Boom Hoses (Between Chassis And Boom)
Installation Of Flushing Tube For Boom Cylinder Hoses
Installation Of Flushing Tube For Arm Cylinder Hoses
Installation Of Flushing Tube For Bucket Cylinder Hoses
Installation Of Hoses Between Boom And Arm (Bottom Dump)
Installation Of Flushing Tube For Bottom Dump Cylinder Hoses
Flushing Of Hydraulic Circuit
Replacement Of Pilot Filter (Flushing Element O Standard Element)
Installation Of Boom Cylinder Bottoms
Installation Of Boom Cylinder Hoses
Installation Of Boom Cylinder Head Pin
Installation Of Arm Cylinder Hoses
Installation Of Bucket Cylinder
Installation Of Bucket Cylinder Hoses
Installation Of Bucket Assembly
Installation Of Bottom Dump Cylinder Hoses
Maintenance Standard
Installation Of Working Lamp
Installation Of Work Equipment Greasing Piping
Bleeding Air From Work Equipment Circuit
Checking Oil Level In Hydraulic Tank And Adding Oil
Greasing After Assembling Work Equipment
INSPECTION OF EACH PART AFTER ASSEMBLY OF LOADER
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet