Komatsu PC1250-8 PC1250LC-8 PC1250SP-8 Field Assembly Instruction Hydraulic Excavator GEN00055-08 manuals in PDF

$9.95

Factory Field Assembly Instructions For Komatsu Hydraulic Excavator.

Photo 8 - Komatsu PC1250-8 PC1250LC-8 PC1250SP-8 Field Assembly Instruction Hydraulic Excavator GEN00055-08
Komatsu PC1250-8 PC1250LC-8 PC1250SP-8 Field Assembly Instruction Hydraulic Excavator GEN00055-08 $9.95
  • Lifetime Free Access
  • Instant Downloads
  • Support and Instructions with download
Guaranteed Safe Checkout

Factory Field Assembly Instructions For Komatsu Hydraulic Excavator.

Format: PDF
Language: English
Pages: 205
Number: GEN00055-08
Bookmarks: Yes
Searchable: Yes

Model

Komatsu Hydraulic Excavator
PC1250-8
SN 30001 And Up
PC1250LC-8
SN 30001 And Up
PC1250SP-8
SN 30001 And Up

Contents

SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
KIT LAYOUT DIAGRAM
TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
TIGHTENING TORQUE
COATING MATERIALS
LIST OF PARTS SENT INDIVIDUALLY
-ASSEMBLY OF CHASSIS
Installation of Left and Right Track Frames
Installation of Travel Piping
Installation of Travel Piping Covers
Installation of Steps
Filling Swing Circle with Grease
Assembly of Upper Structure and Undercarriage
Installation of Right Side Steps
Installation of Handrails
Installation of Swivel Travel Piping
Sticking Sheet To Counterweight (EU Specification)
Installation Of Cover Board (To The Counterweight)
Installation Of Counterweight
Installation Of Left Side Steps (Including Handrails)
Installation Of Radiator Cover (Standard Specification)
Installation Of Radiator Cover (EU Specification)
Installation Of Muffler Tail Pipe
Changing Of Mounting Position Of Step Light
Installation Of Handrail To The Cab
Installation Of Left Rearview Mirror
Installation Of Right Rearview Mirrors
Installation Of Rearview Mirror (On The Counterweight) (EU Specification)
Preparation For Bleeding Air From Travel Motor
Procedure For Bleeding Air From Hydraulic Circuit
Permanent Tightening Of Swing Circle Mounting Bolts
Testing Track Shoe Tension
Check Fuel, Coolant And Oil Levels
Parts To Be Touched Up After Field Assembly
-ASSEMBLING OF WORK EQUIPMENT OF BACKHOE
Installation Of Arm Cylinder
Installation Of Arm Cylinder Hoses
Installation Of Boom Cylinder Foot
Installation Of Boom Cylinder Hoses
Installation Of Boom Foot Dust Seal
Installation Of Boom Assembly
Installation Of Boom Cylinder
Installation Of Boom Hoses (Between Machine And Boom)
Installation Of Arm Assembly
Installation Of Bucket Cylinder Hoses Between Boom And Bucket Cylinder
Installation Of Bucket Assembly
Clearance Standard For Installation Of Work Equipment
Installation Of Work Equipment Grease Piping
Procedure For Bleeding Air From Travel Motor
Bleeding Air From Swing Motor
Bleeding Air From Cylinder
Installation Of Work Equipment Wiring
Greasing After Assembling Work Equipment
-PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
Replacement Of Return Filter (Standard Filter To Flushing Filter)
Relieving Remaining Pressure From Hydraulic Circuit
Installation Of Flushing Tubes
Flushing Of Hydraulic Circuit
Replacement Of Pilot Filter (Flushing Filter To Standard Filter)
-PROCEDURE FOR ASSEMBLING WORK EQUIPMENT OF LOADING SHOVEL
Transportation Posture (Only Work Equipment)
List Of Parts Sent Individually
Procedure For Assembling Work Equipment Of Loading Shovel
Inspection Of Each Part After Assembly Of Loader
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)

What you get

You will receive PDF file with high-quality manual on your email immediately after the payment.

Reviews

There are no reviews yet

Only logged in customers who have purchased this product may leave a review.