Factory Shop Manual For Komatsu Hydraulic Excavator. Manual Contains Illustrations, Instructions, Diagrams For Step By Step Remove And Install, Assembly And Disassembly, Service, Inspection, Repair, Troubleshooting, Tune-Ups.
Format: PDF
Language: English
Pages: 278
Number: WEBM000300 (issued 1999)
Searchable: Yes
Wiring Diagrams: Yes
Hydraulic Diagrams: Yes
Model
Komatsu Hydraulic Excavator
PC35R-8
SN F20001 And Up
PC45R-8
SN F20001 And Up
Contents
FOREWORD
-STRUCTURE AND FUNCTION
PTO
Power Train
Swing Circle
Swing Machinery
Final Drive
Track Frame
Recoil Spring
Carrier Roller
Track Roller
Steel Shoe
Hydraulic Circuit Diagram PC35R
Hydraulic Circuit Diagram PC45R
Hydraulic Pump
Control Valve
CLSS
Swivel Joint
Swing Motor
Travel Motor
Cylinders
Accumulator
PPC Valves (Work Equipment)
PPC Valve (Hammer)
Solenoid Valve
Electrical Diagram
-TESTING AND ADJUSTING
Normal Or Standard Technical Data
Special Tools
Checking The Engine Speed
Adjustment Of Valve Clearance
Measurement Of The Compression Pressure
Control And Adjustment Of The Tension Of The Fan Belt
Control And Adjustment Of The Injection Timing
Control And Adjustment Of The Accelerator Stroke
Adjustment Of The Stroke Of The Blade Command Lever
Adjusting The Flexible Cables
Control And Adjustment Of The Stroke Of The Travel Lever
Adjustment Of The Stroke Of The Boom Swing Command Pedal
Adjustment Of The PPC Valve Clearances
Adjustment Of The Rubber Pad And Safety Microswitch For Servo-Control Engagement
Control And Adjustment Of The Track-Shoe Tension
Control And Regulation Of The Pressures In The Hydraulic Circuits
Control And Regulation Of The LS Differential Pressure And Adjustment Of The Is Valve
Regulation Of The PC Valve
Control And Regulation Of The Servo-Control Power Supply
Elimination Of Residual Pressures – Pressurisation Of The Tank
Bleeding Air From The Hydraulic Circuits
Control Of Hydraulic Drifts – Analysis Of The Causes Of A Drift
Checking For Any Leakages Inside The Working Equipment Cylinders
Checking For Any Leakages Inside The Swing Motor
Methods For Testing For Leakages Inside The Swivel Joint
-REMOVAL AND INSTALLATION
How To Read The Manual
Precautions To Be Taken While Working
Special Tools
Starter Motor
Alternator
Injection Pump
Nozzle Holder
Water Coolant Pump
Cylinder Head
Oil Cooler
Oil Cooler – Radiator Group
Engine Hood
Canopy
Cab
Heating Fan
Counterweight
Fuel Tank
Hydraulic Tank
Engine-Pump Group
Pump
Engine-Pump Coupling
Control Valve
Left-Hand PPC Valve (Arm-Bucket)
Right-Hand PPC Valve (Boom-Bucket)
Servocontrol Solenoid Group
Platform
Swivel Joint
Swing Machinery
Revolving Frame
Swing Circle
Rubber Track Shoes
Steel Track-Shoes
Sprocket Wheel
Final Drive
Idler And Recoil Spring
Spring Recoil And Thrust Cylinder Groups
Idler
Track Rollers
Boom Cylinder
Arm Cylinder
Bucket Cylinder
Boom Swing Cylinder
Blade Cylinder
Work Equipment Cylinders
Upper Work Equipment
Bucket
Arm
Arm Assembly
Boom
Boom Swing Support
Blade
-MAINTENANCE STANDARD
Swing Circle
Swing Machinery
Final Drive
Sprocket
Idler
Steel Shoe
Carrier Roller
Track Roller
Rubber Shoe
Track Frame
Hydraulic Pump
Control Valve
Swivel Joint
Swing Motor
Travel Motor
PPC Valve
PPC Valve (Hammer)
Cylinder
Work Equipment
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet