Factory General Assembly Procedure For Komatsu Hydraulic Mining Shovel.
Format: PDF
Language: English
Pages: 104
Issued: september 2005
Bookmarks: Yes
Searchable: Yes
Model
Komatsu Hydraulic Mining Shovel
PC5000
Contents
Assembly of the Undercarriage
Assembly Of The Cable Reel Unit (Z21885)
Assembly Of The Superstructure Platform Onto The Undercarriage (Z21886)
Assembly Of The Prime Drive Unit To The Superstructure Platform (Z 21887)
Mounting Of The Hydraulic Access Ladder (Z21136)
Assembly Of The Boom Cylinders And The Stick Cylinder To The Boom (Z 21888A; Z 21941, Z 21944)
Assembly Of The Boom (Z21889A)
Assembly Of The Counterweight (Z21891 B)
Mounting Of The Fuel Tank (Z 21892) Or Main Switch Cabinet For Electrical Driven Unit
Mounting Of The Cab Base (Z 21893)
Mounting Of The Cab With Support Frame (Z 21894)
Mounting Of The High Pressure Hoses (Z 21896) And The Hydraulic Oil Tank (Z 21897)
Mounting Of The Hydraulic Oil Cooler (Z 21895)
Mounting Of The Hand Rails. Cat Walks. Steps And The Grease Barrel Crane* (Z 21901)
Mounting Of Cable Transfer To The Operators Cab (Z22937)
Installation Of Hydraulic Hoses To The Attachment And Rotary Joint
Checking Of Direction Motor Rotation Z 22644A
Connection Of Electric Cables
Filling The Hydraulic System (Z25026)
Pre-Checks Prior Initial Start-Up
Assembly of the Stick to the Boom: Z 21890
Mounting of the Stick Cylinders to the Stick (Z 21903)
Assembly of the Bullclam Bucket to the Stick: Z 21904
Mounting of the Pin Seals (Z 21906)
Putting the Lubrication System into operation (Z25022)
Checks and Adjustments Prior Commissioning
Metric Standard Thread
Metric Fine Thread
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet