Komatsu PC750-7 PC750LC-7 PC750SE-7 PC800-7 PC800SE-7 Field Assembly Instruction Hydraulic Excavator GEN00014-03 manuals in PDF

$9.95

Factory Field Assembly Instruction For Komatsu Hydraulic Excavator.

Photo 8 - Komatsu PC750-7 PC750LC-7 PC750SE-7 PC800-7 PC800SE-7 Field Assembly Instruction Hydraulic Excavator GEN00014-03
Komatsu PC750-7 PC750LC-7 PC750SE-7 PC800-7 PC800SE-7 Field Assembly Instruction Hydraulic Excavator GEN00014-03 $9.95
  • Lifetime Free Access
  • Instant Downloads
  • Support and Instructions with download
Guaranteed Safe Checkout

Factory Field Assembly Instruction For Komatsu Hydraulic Excavator.

Format: PDF
Language: English
Pages: 159
Number: GEN00014-03
Bookmarks: Yes
Searchable: Yes

Model

Komatsu Hydraulic Excavator
PC750-7
SN 20001 And Up
PC750LC-7
SN 20001 And Up
PC750SE-7
SN 20001 And Up
PC800-7
SN 40001 And Up
PC800SE-7
SN 40001 And Up

Contents

SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
DISPOSAL OF REMOVED PARTS
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
TIGHTENING TORQUE
COATING MATERIALS LIST
-ASSEMBLY OF CHASSIS
Installation of Left and Right Track Frames
Installation of Travel Pipe
Installation of Top Guard
Installation of Radiator Cover
Installation of Rearview Mirror
Installation of Handrail
Installation of Step
Installation of Left Side Step
Installation of Muffler Tail Tube
Sticking of Sheet (to Counterweight)
Installation of Counterweight
Installation of ORBCOMM Antenna (if equipped)
Installation of Step Light
Installation of Travel Pipe Cover
Extension of Track Frame Gauge (Only When 3-split Packages are transported)
Testing Track Shoe Tension
Installation of Oil Amount and Water Amount
Parts to be Touched up After Field Assembly
-ASSEMBLING OF WORK EQUIPMENT OF BACKHOE
Pulling Out of Boom Foot Pin, and Boom Cylinder Foot Pin
Installation of Boom Assembly
Relieving Remaining Pressure from Hydraulic Circuit
Installation of Boom Cylinder Foot
Installation of Boom Cylinder Hose
Installation of Boom Cylinder
Installation of Arm Cylinder
Installation of Arm Cylinder Hose
Installation of Arm Assembly
Installation of Hose between Boom and Bucket Cylinder
Installation of Bucket Assembly
Lubrication Piping to Work Equipment
Connection of Wiring of Work Equipment
Greasing after Assembling Work Equipment
Air Bleeding from Hydraulic Cylinder
-ASSEMBLING OF WORK EQUIPMENT OF LOADING SHOVEL
Releasing Residual Pressure In Hydraulic Circuit
Pulling Out Boom Foot Pin And Boom Cylinder Foot Pin
Installation Of Boom And Arm Assembly
Installation Of Flushing Piping Between Chassis And Boom
Installation Of Flushing Piping For Boom Cylinder And Arm Cylinder
Installation Of Flushing Piping For Bucket Cylinder
Installation Of Flushing Piping For Bottom Dump Cylinder
Installation Of Boom Cylinder
Installation Of Boom Cylinder Foot
Installation Of Boom Cylinder Hoses
Installation Of Boom Cylinder Rod Pin
Installation Of Arm Cylinder Hoses
Installation Of Bucket Cylinder
Installation Of Bucket Cylinder Hose
Installation Of Connecting Hoses Between Chassis And Boom Top
Installation Of Bottom Dump Cylinder Hoses
Installation Of Bucket Assembly
Installation Of Working Lamps
Installation Of Work Equipment Grease Piping
Greasing After Assembling Of Work Equipment
Bleeding Air From Hydraulic Cylinder
-PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
Inspection Of Oil Level In Hydraulic Tank And Refill
Replacement Of Return Filter (Standard Filter To Flushing Filter)
Flushing Of Hydraulic Circuit
Replacement Of Return Filter (Flushing Filter To Standard Filter)
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)

What you get

You will receive PDF file with high-quality manual on your email immediately after the payment.

Reviews

There are no reviews yet

Only logged in customers who have purchased this product may leave a review.