Factory General Assembly Procedure For Komatsu Hydraulic Mining Shovel.
Format: PDF
Language: English
Pages: 158
Bookmarks: Yes
Searchable: Yes
Model
Komatsu Hydraulic Mining Shovel
PC8000
Contents
Mounting of Crawler Segments to the Side Frames: Z22917
Assembly of Undercarriage: Z22918
Assembly of Cable Reel Unit: Z22919
Mounting of Final Drives: Z22921
Electric drive only: Mounting of auxiliary weight at the undercarriage: Z22993
Mounting of Slew Ring underneath the Superstructure Platform: Z22922
Assembly of the Superstructure Platform onto the Undercarriage: Z22923
Assembly of the Prime Drive Unit to the Superstructure Platform:
Preassembly Boom- and Stick Cylinders to the Boom:
Mounting of Boom Z22933
Mounting of Counterweight: Z22934A
Mounting the Fuel Tank: Z22935 or Main Switch Cabinet for electric Driven Unit
Mounting of Cab Support Z22936
Mounting of Operator’s Cab
Mounting of Hydraulic Oil Tank Z22941
Mounting of Hydraulic Oil Coolers Z22942; Z22943
Mounting Hand Rails, Cat Walks, Steps, Stairs and Ladders: Z22944; Z22945
Install the hydraulic access ladder Z22946
Installation of Muffler Assy, and Cover: Z22928
Installation of Air Filters: Z22929 – Z22931
Installation of Lubrication Station and auxiliary Crane Z22947; Z22948
Connection of cable harnesses to the X – boards
Installation of Hose connections on Hydr. Tank and Hydr. Oil Coolers: Z22949; Z22950
Installation of HP- Hoses in between HP – Filters and Main Valve Blocks: Z22953
Mounting of Bucket Cylinders : Z22954: Z22955
Mounting of Stick: Z22956
Installation Of Hose Connections To The Boom: Z22957; Z22958
Filling Up Hydraulic Tank Z22959
Pre-Checks For Initial Start-Up
Mounting Of Stick Cylinders To The Stick: Z22961
Mounting Of The Pin Seals
Assembly of Bullclam Bucket to the Stick
Assembling and testing the Fire Detection, Actuation and Suppression System
Checks and Adjustments Prior to Commissioning
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet