Factory Shop Manual For Komatsu Skid Steer Loader. Manual Contains Illustrations, Instructions, Diagrams For Step By Step Remove And Install, Assembly And Disassembly, Service, Inspection, Repair, Troubleshooting, Tune-Ups.
Format: PDF
Language: English
Pages: 258
Number: WEBM006000
Searchable: Yes
Wiring Diagrams: Yes
Hydraulic Diagrams: Yes
Model
Komatsu Skid Steer Loader
SK1026-5 Turbo
SN 37CTF50001
Contents
FOREWORD
-STRUCTURE AND FUNCTION
Power Train
Transmission
Final Drive
Hydraulic Circuit
Hydraulic Pump
Control Valve (3-Spool)
Control Valve (4-Spool)
CLSS
Solenoid Valve
Accumulator
Pattern Change Valve (Opt)
RH PPC Valve
LH PPC Valve
Cylinders
Electrical Diagram (Engine Line)
-TESTING AND ADJUSTING
Normal Or Standard Technical Data
Special Tools
Checking The Engine Speed
Adjustment Of Valve Clearance
Measurement Of The Compression Pressure
Control And Adjustment Of The Fan Belt Tension
Control And Adjustment Of The Injection Timing
Checking Engine Oil Pressure
Adjusting The Stroke Of The Accelerator Cables
Regulation Of PPC Valves Drive Pressure
Adjustment Of The PPC Valve Clearances
Adjusting The Position Of The Servo-Control Engagement Safety Sensor
Testing And Adjustment Of Gearing Chain Tension
Control And Regulation Of The Pressures In The Hydraulic Circuits
Testing The Hydraulic Pump
Valve Calibration
Checking The Travel Deviation
Control Valve
Control And Regulation Of The Servo-Control
Power Supply
Elimination Of Residual Pressures – Pressurisation Of The Tank
Bleeding Air From The Hydraulic Circuits
-DISASSEMBLY AND ASSEMBLY
How To Read The Manual
Precautions To Be Taken While Working
Engine Hood
Cab
Battery
Starting Motor
Alternator
Air Intake Filter
Muffler
Valve Cover
Nozzle
Injection Pump
Cylinder Head
Turbocharger
Coolant Liquid Pump
Radiator Group
Fuel Tank
Cab
Engine-Pump Group
Complete Hydraulic Pump
Gear Pump
Engine-Pump Coupling
Control Valve
PPC Valves
Heating Fan
Hub Wheel
Final Drive
Raising Cylinder
Bucket Cylinder
Work Equipment Cylinder
Complete Working Equipment
Fulcrum Lever
Lift Lever
Working Equipment Support Frame
-MAINTENANCE STANDARD
PTO
Transmission
Final Drive
Hydraulic Pump
Control Valve (Super High-Flow Version)
RH PPC Valve
LH PPC Valve (Standard)
LH PPC Valve Pattern Change (Opt)
Pattern Change Valve (Opt)
Cylinders
Working Equipment
What you get
You will receive PDF file with high-quality manual on your email immediately after the payment.
Reviews
There are no reviews yet